A Tennessee automotive element producer has flipped the swap on a 1.5-MW photo voltaic undertaking developed by Silicon Ranch.
Challenge companions Silicon Ranch, the Tennessee Valley Authority and the Metropolis of Maryville broke floor on the photo voltaic farm for producer DENSO in November 2022 and completed building this summer season.
That is simply the primary of three photo voltaic tasks totaling 10.5 MW the group plans to carry on-line in Blount County, Tennessee. Silicon Ranch tasks the second facility to be on-line by December of 2025 and anticipates that the third will come on-line within the second quarter of 2026.
Along with its position within the three photo voltaic tasks in Blount County, DENSO can even supply photo voltaic vitality from a fourth Silicon Ranch facility elsewhere within the Tennessee Valley by way of TVA’s Inexperienced Make investments program. The TVA program affords enterprise and business a well timed and cost-effective resolution to satisfy their sustainability targets. When all amenities are accomplished, DENSO will leverage every, together with different conservation initiatives, to supply all of DMTN’s electrical wants from renewable vitality sources.
“This exercise exhibits how we don’t solely attempt to be inexperienced by way of our merchandise, but in addition by way of our operations and vitality use,” stated Chuntao Ye, president of DMTN and enterprise chief of the DENSO North America Peace of Thoughts Enterprise Group.
Information merchandise from DENSO
